Three Engineered Portfolios. One Utility Partner.
MacLean Power Systems engineers and manufactures three connected utility portfolios. Each is designed for a specific operational moment — installation, daily switching and protection, and transmission infrastructure — and all three are built to the same engineering standard, supplied to Canadian utilities through Rexel Utility.
Plus the engineering layers that cut across all three: safety and efficiency design, automation and SCADA integration, and ANSI/IEEE/CSA standards compliance.
Installation Efficiency, Engineered Into the Hardware.
ERGO is MPS’s installation-efficient inline disconnect platform — engineered around the operational reality of distribution work: thinner crews, tighter schedules, more time on energized assets than anyone wants. ERGO installs below the line: a lineman twists the switch into place by hand, with no fire-on tool, so there are no misfires, no jams, and no wedge-driven connections to correct after the fact. A built-in range-taking connector system inside the switch body lets it work across conductor sizes without a separate, conductor-specific connector — the switch effectively functions like a tool. The design eliminates steps from the install procedure, reduces the tooling load a crew brings to the pole, and — where utility procedure permits — supports single-person installation.
Key ERGO capabilities
- Below-the-line installation — the lineman works below live lines rather than above or between energized conductors, cutting exposure during the highest-risk part of the job.
- Tool-free, fire-on-free install — the switch twists into place by hand, eliminating the misfires, jams, and failed connections associated with fire-on wedge tools.
- Built-in range-taking connector system inside the switch body — no external connector dependent on a specific conductor size; the switch functions like a tool across conductor ranges.
- Glove-friendly key ring nuts — secured with hardware crews can handle with gloves on, simplifying the install.
- In-line sectionalizing — isolates only the damaged section of line so the rest of the circuit stays energized during repairs, limiting customer outages and speeding restoration.
- Single-person installation capability where permitted by utility operating procedure.
- Compatible with standard distribution line configurations across Canadian utility voltage classes.
Distribution Switching, Built for the Modern Grid.
Inertia is MPS’s distribution switching and protection portfolio — engineered for utilities that need field hardware ready to participate in automation, SCADA integration, and modern fault-management workflows on day one. Reclosers, switches, and protection devices share consistent communications and sensing interfaces, so a utility’s modernization roadmap doesn’t depend on swapping vendors per voltage class.
Inertia product groups:
Operational capabilities across the Inertia portfolio
Transmission-Class Assemblies. Engineered Per Application.
MPS’s engineered transmission portfolio supplies utility-grade hardware and structural assemblies for transmission infrastructure projects. The portfolio is designed to scale distribution capabilities into transmission applications, so utilities can specify across voltage classes — and projects can move between distribution and transmission scope — from one engineering partner.
Transmission portfolio scope:
- Engineered structural hardware for transmission infrastructure
- Utility-grade assemblies fabricated to project specifications
- Scalable across distribution-to-transmission voltage classes
- Project-specific kitting via MPS application engineering
Transmission projects move at a different pace than distribution work — longer engineering lead times, more specification iteration, and tighter project gating. MPS’s transmission engineering is built into the supply relationship rather than treated as a separate channel.
Designed to Take Steps Out of the Highest-Risk Work.
Across ERGO, Inertia, and the Transmission portfolio, MPS engineers products around a consistent principle: take the highest-risk steps out of utility work where the hardware can absorb that complexity instead of the crew. The result is a portfolio designed for safer installs, simpler operations, and reduced exposure during the moments when the cost of getting it wrong is highest.
How this shows up in the field:
SCADA-Ready, Sensing-Capable, Modernization-Aligned.
Modernization on the Canadian grid is a multi-year program, not a single deployment. MPS engineers Inertia switching and protection hardware to plug into that program rather than be replaced by it — communications interfaces, sensing capability, and SCADA integration are built into the product line, not added later as accessories.
From Field Hardware to Utility Automation Platform
How MPS Inertia switching and protection devices integrate with utility SCADA, analytics, and DERMS-adjacent platforms.
Telemetry
SCADA
Why This Matters for Modernization
Communications-ready from day one. Hardware plugs into utility comms platforms as those roll out — no field swap.
Vendor-neutral interfaces. Integration works across major utility automation vendors — no lock-in on the modernization investment.
Incremental rollout. Modernize one substation or feeder at a time without retiring still-useful field hardware.
Modern-grid capabilities:
ANSI. IEEE. CSA. Engineered and Tested to the Specs Utilities Specify.
Every MPS product family is engineered and tested to the standards Canadian and North American utilities specify. Standards aren’t an afterthought — they’re built into the product engineering and documented at the assembly level, so utility engineering teams get the documentation they need on the first request.
Ready to Spec ERGO, Inertia, or Transmission Hardware?
Whether the project is a distribution inline disconnect refresh, a substation switching modernization, or a transmission hardware scope, MPS application engineering — coordinated through Rexel Utility’s regional account managers — can move from initial conversation to a documented spec in days, not weeks.